PROJECT FEASIBILITY REPORT
FOR
M/s. Company Name
Address
OF
Names of CHEMICALS
AT
Location
Date of Preparation
INDEX
| CHAPTER | CONTENTS | PAGE NO. |
| 1 | PROJECT HIGHLIGHTS | |
| 2 | INTRODUCTION | |
| 3 | PRODUCT DESCRIPTION AND USES | |
| 4 | MARKET SURVEY AND DEMAND SUPPLY POSITION | |
| 5 | RAW MATERIALS AND SUPPLIERS | |
| 6 | MANUFACTURING PROCESS DESCRIPTION | |
| 7 | PROJECT IMPLEMENTATION SCHEDULE | |
| 8 | UTILITIES REQUIREMENTS | |
| 9 | UTILITIES SPECIFICATIONS | |
| 10 | PRODUCTION CAPACITY AND TARGET | |
| 11 | MARKET AND SELLING ARRANGEMENTS | |
| 12 | SALIENT FEATURES AND PROJECT HIGHLIGHTS | |
| 13 | BASIS AND PRESUMPTION | |
| 14 | MANPOWER AND ORGANIZATION | |
| 15 | COST OF PROJECT AND MEANS OF FINANCE | |
| 16 | COST OF LAND AND BUILDING | |
| 17 | SUMMARY OF PLANT AND MACHINERY | |
| 18 | COST OF UTILITIES | |
| 19 | MISC. FIXED ASSETS | |
| 20 | SUMMARY OF PIPING AND FITTINGS | |
| 21 | LIST OF LABORATORY EQUIPMENT | |
| 22 | PRELIMINARY AND PREOPERATIVE EXPENSES | |
| 23 | CONTINGENCIES AND ESCALATION EXPENSES | |
| 24 | CALCULATION OF CAPITALIZATION SCHEDULE OF ASSETS | |
| 25 | COMPUTATION OF WORKING CAPITAL | |
| 26 | SALES REALIZATION | |
| 27 | COST OF PRODUCTION AND PROFITABILITY | |
| 28 | CASH AND FUNDS FLOW STATEMENT | |
| 29 | SUMMARY OF EXPENSES | |
| 30 | RAW MATERIAL AND PACKING EXPENSES | |
| 31 | REPAIRS, MAINTENANCE & CONSUMABLE STORES | |
| 32 | SALARIES AND WAGES | |
| 33 | COST OF UTILITIES | |
| 34 | ADMINISTRATIVE EXPENSES AND OVERHEADS | |
| 35 | CALCULATION OF DEPRECIATION | |
| 36 | INTEREST CALCULATION AND REPAYMENT SCHEDULE |
CHAPTER II
INTRODUCTION
2.1 GENERAL : Company information : Details of new products and project, location of project 2.2 SCHEDULE OF PROJECT IMPLEMENTATION :A PERT Chart is given to indicate the schedule. 2.3 MANAGEMENT AND TECHNICAL EXPERTISE : The company is promoted by dynamic enthusiastic and enterprising persons consisting of professionals in various fields. 2.4 PAST PERFORMANCE :| Year | ||||
| Sales | ||||
| Net Profit | ||||
| Book Value | ||||
| Earning per share |
CHAPTER III
PRODUCT DESCRIPTION AND USESPRESENT PRODUCTS :
CHAPTER IV
MARKET SURVEY AND DEMAND SUPPLY POSITION
CHAPTER V
RAW MATERIALS
CHAPTER VI
MANUFACTURING PROCESS DESCRIPTION
6.1 TECHNOLOGY :The technology used for the manufacture of this product is based on experience of the technical persons associated with the project. The technology is developed and tested in-house. The project will be implemented by a team of engineers who have already installed similar plants and have a wide ranging experience in the project implementation and commercial production of the chemicals. The engineering work as well as turnkey services would be done in-house.
6.2 MANUFACTURE : 6.2.1 Raw Materials : The raw materials required are : 6.2.2 Product Mix : Based on Market Survey and Trends, the following product mix has been selected. 6.2.3 Brief Process Description : The Manufacturing process 6.2.4 Process Flow Diagram : Process flow diagram for the manufacture 6.3 TREATMENT OF LIQUID EFFLUENTS :CHAPTER VII
PROJECT IMPLEMENTATION SCHEDULE
| Services | Period Required (weeks) |
| Architectural and Civil Design for non-plant building | |
| Architectural and Civil Design for plant building | |
| Mechanical Equipment Design | |
| Equipment Layout | |
| Electrical and Engineering Design |
CHAPTER VIII
UTILITIES REQUIREMENT
| Equipment | Quantity | Power HP |
| TOTAL HP | ||
CHAPTER IX
UTILITIES SPECIFICATIONS
Utilities Specifications:
5.1 Process Water : Process water should be free of mud and suspended particles. It should be available at a pressure of 3 Kg / cm2.CHAPTER X
PRODUCTION CAPACITY AND TARGET
| Year | I | II | III | IV | V | VI | VII |
| Capacity Utilization % | 40 | 50 | 60 | 70 | 80 | 90 | 100 |
| Production |
CHAPTER XI
MARKET AND SELLING ARRANGEMENTS
CHAPTER XII
SALIENT FEATURES AND PROJECT HIGHLIGHTS
12.1 Product
12.2 Incentives for Industrially Backward Area : 12.3 Government Quota for Raw Material : 12.4 Other Raw Materials : 12.5 Market Potential : 12.6 Nearness to Market and Raw Materials : 12.7 Low Overheads : 12.8 Infrastructure Facilities : 12.9 Effluent Treatment: 12.10 Basis of Plant Design : 12.11 Plant Suppliers : 12.12 Labour : 12.13 By-products : 12.14 Employment Potential : 12.15 Quality Control :CHAPTER XIII
BASIS AND PRESUMPTIONS
While deriving out various figures and projections in this Project Report, following Basis and Presumptions have been made :CHAPTER XIV
MANPOWER AND ORGANIZATION
CHAPTER XV
COST OF PROJECT AND MEANS OF FINANCE
| 1 | Land and site | |
| 2 | Building and Civil Work | |
| 3 | Plant And Machinery | |
| 4 | Utilities | |
| 5 | Engineering Fees | |
| 6 | Misc. Fixed Assets | |
| 7 | Prelim. & Preoperative expenses including cost of public issue | |
| 8 | Contingencies and Escalation | |
| 9 | Margin Money for working Capital | |
| 10 | Provision for Know How Fees |
| 1 | Promoters' Capital | |
| 2 | Secured Term Loan | |
| 3 | Capital Incentive Subsidy |
C. DEBT/EQUITY RATIOHence, Security Margin =
Term Loan D. E. Ratio = --------------------- = Equity + Subsidy D. SECURITY MARGIN Tangible Assets - Term Loan Security Margin = ----------------------------------------- x 100 % Tangible Assets Tangible Assets = Cost of Project - Working Capital Margin - Prelim. expenses + Interest during Construction
CHAPTER XVI
COST OF LAND AND BUILDING
| Particulars | Rate | Cost |
| Cost of 10800 sq.mt.(120x90) land | ||
| Cost of Leveling and Land Development | ||
| Cost of Construction of Internal Roads 300 mts | ||
| Cost of Fencing | ||
| Cost of Gates | ||
| Total | ||
| Particulars | Rate | Cost |
| Factory Building with Staircase and water Tank | ||
| Office and Laboratory | ||
| Store House | ||
| Canteen | ||
| Change Room | ||
| Watch & Ward | ||
| Equipment foundations, Sewers, drains etc. | ||
| Effluent Tanks | ||
| Misc. Civil Work | ||
| Architect and structural Engineers' fee | ||
| Total | ||
| Total of 16.1 and 16.2 | ||
CHAPTER XVII
SUMMARY OF PLANT AND MACHINERY
| Equipment Specifications | HP | Price | |
| A | |||
| B | |||
| C | |||
| D | Utilities | ||
| Total Plant cost (A+B+C+D) | |||
| Add: C Excise @ | |||
| Add: Central Sales Tax @ | |||
| Add: Insurance @ | |||
| Add: Transportation, Freight, Packing, Loading, Forwarding, unloading Charges to Factory Site | |||
| Erection and Commissioning charges | |||
| Add: Painting/Coating Charges | |||
| Grand Total | |||
CHAPTER XVIII
COST OF UTILITIES| Equipment Specifications | HP | Price | |
| A | Boiler | ||
| B | Cooling Tower for Cooling Water | ||
| C | Vacuum Pump | ||
| D | Fire fighting Equipment | ||
| Total Utilities cost (A+B+C+D) | |||
| Add: C Excise @ | |||
| Add: Central Sales Tax @ | |||
| Add: Insurance @ | |||
| Add: Transportation, Freight, Packing, Loading, Forwarding, Unloading Charges to Factory Site | |||
| Erection and Commissioning charges | |||
| Add: Painting/Coating Charges | |||
| Grand Total | |||
CHAPTER XIX
MISCELLANEOUS FIXED ASSETS
| Description | Cost | |
| 1 | Piping and Fitting for distribution of water, raw materials, and product, As per Schedule in Chapter XX | |
| 2 | Laboratory Furniture and Instruments | |
| 3 | Office Machinery | |
| 4 | Misc. Books | |
| 5 | Equipment Cabling for Factory and Office | |
| 6 | Spares for plant | |
| 7 | Other Misc. Fixed assets | |
| Total | ||
CHAPTER XX
SUMMARY OF PIPING AND FITTINGS
| Item | Size mm NB | Labor Rate | Unit Rate | Qty. | Total |
| MS Pipe | |||||
| SS Pipe | |||||
| TOTAL (A) | |||||
| Item | Size mm NB | Labor Rate | Unit Rate | Qty. | Total |
| CI Gate Valves | |||||
| CI Globe Valves | |||||
| SS 316 Ball Valve | |||||
| GM Globe Valves | |||||
| TOTAL (B) | |||||
| Item | Size mm NB | Labor Rate | Unit Rate | Qty. | Total |
| Short Stub Ends | |||||
| Elbows | |||||
| Tee | |||||
| Threaded Nipple | |||||
| TOTAL (C) | |||||
| Item | Size mm NB | Labor Rate | Unit Rate | Qty. | Total |
| Flanges | |||||
| Elbows | |||||
| Tee | |||||
| Threaded Nipple | |||||
| TOTAL (D) | |||||
| Item | Size mm NB | Labor Rate | Unit Rate | Qty. | Total |
| Nuts, Bolts, Washers | |||||
| Gaskets, Packing | |||||
| U-bolts | |||||
| Insulation | |||||
| TOTAL (E) | |||||
| Item | Size mm NB | Labor Rate | Unit Rate | Qty. | Total |
| Safety Valves | |||||
| Level Indicator | |||||
| Pressure Gauge | |||||
| Temp. Indicators | |||||
| Vacuum Gauge | |||||
| Sight Glass | |||||
| Steam Trap, float type | |||||
| Temp Indicator | |||||
| TOTAL (F) | |||||
| GRAND TOTAL (A+B+C+D+E+F) | |||||
CHAPTER XXI
LIST OF LABORATORY EQUIPMENT
| Sl. No. | Item | Price |
| 1 | Portable pH meter | |
| 2 | Analytical Balance | |
| 3 | Oven for heat resistance test | |
| 4 | Water Distillation Unit | |
| 5 | Laboratory Stirrer | |
| 6 | Misc. Glassware | |
| 7 | Weight / Liter Cups | |
| TOTAL | ||
CHAPTER XXII
PRELIMINARY AND PREOPERATIVE EXPENSES SUMMARY
| Sr. No. | Item | Period (Months) | Total | |||
| 0-3 | 3-6 | 6-9 | 9-12 | |||
| 1 | Establishment charges | |||||
| 2 | Rents & Taxes | |||||
| 3 | Company Registration | |||||
| 4 | Promotional Expenses | |||||
| 5 | Insurance | |||||
| 6 | Traveling Expenses | |||||
| 7 | Postage, Telephones | |||||
| 8 | Printing & Stationary | |||||
| 9 | Advertising Expenses | |||||
| 10 | Guarantee, Commission | |||||
| 11 | Interest During Construction | |||||
| 12 | Issue expense | |||||
| 13 | Startup Expenses | |||||
| Total | ||||||
CHAPTER XXIII
CONTINGENCIES AND ESCALATION EXPENSES
| Sl.No. | Particulars | Cost |
| 1 | Land and site development | |
| 2 | Building & Civil Work | |
| 3 | Plant & Machinery | |
| 4 | Utilities | |
| 5 | Know how and engineering fee | |
| 6 | Misc. Fixed Assets | |
| 7 | Preliminary and Preoperative Expenses | |
| Total | ||
| Sl. No. | Item | Firm cost | Non-firm cost | Escalation 20 % |
| 1 | Land & Site Development | |||
| 2 | Building & Civil Work | |||
| 3 | Plant & Machinery | |||
| 4 | Utilities | |||
| 5 | Engineering Fees | |||
| 6 | Misc. Fixed Assets | |||
| 7 | Preliminary & Pre operative Expenses | |||
| Total | ||||
CHAPTER XXIV
CALCULATION OF CAPITALIZATION SCHEDULE OF ASSETS
Item | % of Capital Cost | |
A | Land and site development | |
B | Building and Civil Work | |
C | Plant & Machinery | |
D | Utilities | |
E | Engineering Fees | |
F | Misc. Fixed Assets | |
G | Preliminary and preoperative expenses | |
H | Contingencies and escalation |
| Item | Contingencies | Expenses Provision | Total Amount |
Land & Site Development | |||
Building and Civil Work | |||
Plant and Machinery | |||
Utilities | |||
Engineering Fees | |||
Misc. Fixed Assets | |||
Preliminary and pre-operative expenses |
| Item | Cost | % Amount Allocated | Total Cost |
| Building and Civil Work | |||
| Plant & Machinery | |||
| Utilities | |||
| Misc. Fixed Assets |
| Sl. No. | Item | Value |
| 1 | Land & Site Development | |
| 2 | Building and Civil Work | |
| 3 | Plant and Machinery | |
| 4 | Utilities | |
| 5 | Miscellaneous Fixed assets |
CHAPTER XXV
COMPUTATION OF WORKING CAPITAL REQUIREMENTS
| Item | Period / Stock | Basis % | Year I | Year II | ||
| Amount | Margin | Amount | Margin | |||
| Raw Materials | ||||||
| Packing Materials | ||||||
| Goods in Process | ||||||
| Finished Goods | ||||||
| Debtors | ||||||
| Salary & Wages | ||||||
| Other Utilities | ||||||
| Admin Overhead | ||||||
| Selling Overhead | ||||||
| Total | ||||||
| Sl. No. | Item | Year I | Year II |
| Total W.C. Requirement | |||
| Promoter's Margin | |||
| Permissible Bank Limits |
| Item | Period / Stock | Basis % | Year III | Year IV | ||
| Amount | Margin | Amount | Margin | |||
| Raw Materials | ||||||
| Packing Materials | ||||||
| Goods in Process | ||||||
| Finished Goods | ||||||
| Debtors | ||||||
| Salary & Wages | ||||||
| Other Utilities | ||||||
| Admin Overhead | ||||||
| Selling Overhead | ||||||
| Total | ||||||
| Sl. No. | Item | Year III | Year IV |
| Total W.C. Requirement | |||
| Promoter's Margin | |||
| Permissible Bank Limits |
| Item | Period / Stock | Basis % | Year V | Year VI | ||
| Amount | Margin | Amount | Margin | |||
| Raw Materials | ||||||
| Packing Materials | ||||||
| Goods in Process | ||||||
| Finished Goods | ||||||
| Debtors | ||||||
| Salary & Wages | ||||||
| Other Utilities | ||||||
| Admin Overhead | ||||||
| Selling Overhead | ||||||
| Total | ||||||
| Sl. No. | Item | Year V | Year VI |
| Total W.C. Requirement | |||
| Promoter's Margin | |||
| Permissible Bank Limits |
| Item | Period / Stock | Basis % | Year VII | |
| Amount | Margin | |||
| Raw Materials | ||||
| Packing Materials | ||||
| Goods in Process | ||||
| Finished Goods | ||||
| Debtors | ||||
| Salary & Wages | ||||
| Other Utilities | ||||
| Admin Overhead | ||||
| Selling Overhead | ||||
| Total | ||||
| Sl. No. | Item | Year VII |
| Total W.C. Requirement | ||
| Promoter's Margin | ||
| Permissible Bank Limits |
CHAPTER XXVI
SALES REALIZATION TABLE Rs.'00,000
Year | I | II | III | IV | V | VI | VII |
| % Capacity Utilization | |||||||
| Quantity Tons | |||||||
| Sales @Rs | |||||||
| Total Rs. |
CHAPTER XXVII
COST OF PRODUCTION AND PROFITABILITY Rs.'000
| Sl No | Item | Year | ||||||
| I | II | III | IV | V | VI | VII | ||
| 1 | Production in tons | |||||||
| 2 | Sales Rs.'000 | |||||||
| less 10 % discount Rs.'000 | ||||||||
| Net Sales Rs.'000 | ||||||||
| 3 | Raw Material Cost Rs.'000 | |||||||
| 4 | Packing Cost Rs.'000 | |||||||
| 5 | Utilities Cost, Rs.'000 | |||||||
| 6 | Salaries & Wages Rs.'000 | |||||||
| 7 | Consumables, Stores,Rs.'000 | |||||||
| 8 | Repairs & Maint. Rs.'000 | |||||||
| 9 | Depreciation, Rs.'000 | |||||||
| 10 | Total Cost of Production Rs.'000 | |||||||
| 11 | Add : opening Stock Rs.'000 | |||||||
| 12 | Less : closing Stock Rs.'000 | |||||||
| 13 | Cost of Sales,Rs.'000 | |||||||
| 14 | Gross Profit, Rs.'000 | |||||||
| 15 | Interest, Rs.'000 | |||||||
| i. on Term Loan | ||||||||
| ii. on W.C.Loan | ||||||||
| 16 | Admin. Overheads Rs.'000 | |||||||
| 17 | Selling Overheads & Exp. Rs. '000 | |||||||
| 18 | Total of 15,16,17, Rs.'000 | |||||||
| 19 | Profit before tax (14-18) Rs.'000 | |||||||
| 20 | Provision for Tax Rs. '000 | |||||||
| 21 | Net Profit after tax Rs.'000 | |||||||
| 22 | less ; Dividend,Rs.'000 | |||||||
| 23 | Retained Profits,Rs.'000 | |||||||
| add:depreciation,Rs.'000 | ||||||||
| 24 | Net cash accruals,Rs.'000 | |||||||
| 25 | Repayment to bank, Rs.'000 | |||||||
CHAPTER XXVIII
CASH AND FUNDS FLOW STATEMENT Rs.'000
| Item | const. period | Year | ||||||
| I | II | III | IV | V | VI | VII | ||
| Promoters Share, Rs.'000 | ||||||||
| Profit after depreciation, Prelim. exp. w/off, and Investment allowance reserves and interest and taxation Rs.'000 | ||||||||
| Investment allow. Reserves Rs.'000 | ||||||||
| Depreciation Rs.'000 | ||||||||
| Capital Subsidy, Rs.'000 | ||||||||
| Term Loan, Rs.'000 | ||||||||
| Bank Borrowing, Rs.'000 | ||||||||
| Total Rs.'000 | ||||||||
| Item | const. period | Year | ||||||
| I | II | III | IV | V | VI | VII | ||
| Capital Expenditure Rs.'000 | ||||||||
| Current assets Rs.'000 | ||||||||
| Preliminary Exp. Rs.'000 | ||||||||
| Decrease in term loan Rs.'000 | ||||||||
| Tax, Rs.'000 | ||||||||
| Interest, Rs.'000 | ||||||||
| Dividend, Rs.'000 | ||||||||
| Total Rs.'000 | ||||||||
CHAPTER XXIX
SUMMARY OF EXPENSES
| Item | Year | ||||||
| I | II | III | IV | V | VI | VII | |
| Raw Materials | |||||||
| Packing Materials | |||||||
Utilities : Power + Water | |||||||
| Stores | |||||||
| Repairs & Maintenance | |||||||
| Salary & Wages | |||||||
| Admin Overheads | |||||||
| Selling Overheads | |||||||
| Total Rs.'000 | |||||||
CHAPTER XXX
RAW MATERIALS AND PACKING EXPENSES
| Production, Tons/Year | RM required, Tons/Year | RM Price, Rs./Ton | RM Cost per year, Rs. '000 |
| Item | Year | ||||||
| I | II | III | IV | V | VI | VII | |
| % Capacity Utilization | 40 | 50 | 60 | 70 | 80 | 90 | 100 |
| Raw Materials Cost | |||||||
| Item | Year | ||||||
| ALIGN="CENTER">I | II | III | IV | V | VI | VII | |
| % Capacity Utilization | 40 | 50 | 60 | 70 | 80 | 90 | 100 |
| Packing Expenses | |||||||
CHAPTER XXXI
REPAIRS, MAINTENANCE & CONSUMABLE STORES
| Item | Year | ||||||
| I | II | III | IV | V | VI | VII | |
| Repairs and Maintenance Expenses | |||||||
CHAPTER XXXII
SALARIES & WAGES
| Staff | I Year | II Year | |||||
| No. | Salary / month | Amount Rs. | No | Salary / month | Amount Rs. | ||
| Skilled | Fixed | ||||||
| Casual | |||||||
| Unskilled | Fixed | ||||||
| Casual | |||||||
| SUB TOTAL | |||||||
| add @25 % perks | |||||||
| TOTAL A | |||||||
| Staff | I Year | II Year | ||||
| No | Salary / month | Amount Rs. | No | Salary / month | Amount Rs. | |
| General Manager | ||||||
| Production Manager | ||||||
| Chemist | ||||||
| Supervisor | ||||||
| Electrician | ||||||
| SUB TOTAL | ||||||
| add @25 % perks | ||||||
| TOTAL B | ||||||
| Staff | I Year | II Year | ||||
| No | Salary / month | Amount Rs. | No | Salary / month | Amount Rs. | |
| Typist | ||||||
| Administrative Assistant | ||||||
| Watchmen | ||||||
| SUB TOTAL | ||||||
| add @25 % perks | ||||||
| TOTAL C | ||||||
| GRAND TOTAL (A+B+C) | ||||||
| Staff | III Year | IV Year | |||||
| No. | Salary / month | Amount Rs. | No | Salary / month | Amount Rs. | ||
| Skilled | Fixed | ||||||
| Casual | |||||||
| Unskilled | Fixed | ||||||
| Casual | |||||||
| SUB TOTAL | |||||||
| add @25 % perks | |||||||
| TOTAL A | |||||||
| Staff | III Year | IV Year | ||||
| No | Salary / month | Amount Rs. | No | Salary / month | Amount Rs. | |
| General Manager | ||||||
| Production Manager | ||||||
| Chemist | ||||||
| Supervisor | ||||||
| Electrician | ||||||
| SUB TOTAL | ||||||
| add @25 % perks | ||||||
| TOTAL B | ||||||
| Staff | III Year | IV Year | ||||
| No | Salary / month | Amount Rs. | No | Salary / month | Amount Rs. | |
| Typist | ||||||
| Administrative Assistant | ||||||
| Watchmen | ||||||
| SUB TOTAL | ||||||
| add @25 % perks | ||||||
| TOTAL C | ||||||
| GRAND TOTAL (A+B+C) | ||||||
| Staff | V Year | VI Year | |||||
| No. | Salary / month | Amount Rs. | No | Salary / month | Amount Rs. | ||
| Skilled | Fixed | ||||||
| Casual | |||||||
| Unskilled | Fixed | ||||||
| Casual | |||||||
| SUB TOTAL | |||||||
| add @25 % perks | |||||||
| TOTAL A | |||||||
| Staff | V Year | VI Year | ||||
| No | Salary / month | Amount Rs. | No | Salary / month | Amount Rs. | |
| General Manager | ||||||
| Production Manager | ||||||
| Chemist | ||||||
| Supervisor | ||||||
| Electrician | ||||||
| SUB TOTAL | ||||||
| add @25 % perks | ||||||
| TOTAL B | ||||||
| Staff | V Year | VI Year | ||||
| No | Salary / month | Amount Rs. | No | Salary / month | Amount Rs. | |
| Typist | ||||||
| Administrative Assistant | ||||||
| Watchmen | ||||||
| SUB TOTAL | ||||||
| add @25 % perks | ||||||
| TOTAL C | ||||||
| GRAND TOTAL (A+B+C) | ||||||
| Staff | VII Year | |||
| No. | Salary / month | Amount Rs. | ||
| Skilled | Fixed | |||
| Casual | ||||
| Unskilled | Fixed | |||
| Casual | ||||
| SUB TOTAL | ||||
| add @25 % perks | ||||
| TOTAL A | ||||
| Staff | VII Year | ||
| No | Salary / month | Amount Rs. | |
| General Manager | |||
| Production Manager | |||
| Chemist | |||
| Supervisor | |||
| Electrician | |||
| SUB TOTAL | |||
| add @25 % perks | |||
| TOTAL B | |||
| Staff | VII Year | ||
| No | Salary / month | Amount Rs. | |
| Typist | |||
| Administrative Assistant | |||
| Watchmen | |||
| SUB TOTAL | |||
| add @25 % perks | |||
| TOTAL C | |||
| GRAND TOTAL (A+B+C) | |||
CHAPTER XXXIII
COST OF UTILITIES
| Item |
Year |
||||||
| I | II | III | IV | V | VI | VII | |
| % Capacity Utilization | 40 | 50 | 60 | 70 | 80 | 90 | 100 |
| Utilities Cost | |||||||
CHAPTER XXXIV
ADMINISTRATIVE EXPENSES AND OVERHEAD
| Item | Year | ||||||
| I | II | III | IV | V | VI | VII | |
| Adviser's Remuneration | |||||||
| Utilities Cost | |||||||
| Telephone / Telex | |||||||
| Printing / Stationary | |||||||
| Audit Fee | |||||||
| Rent/tax | |||||||
| Conveyance | |||||||
| Insurance | |||||||
| Item | Year | ||||||
| I | II | III | IV | V | VI | VII | |
| Traveling | |||||||
| Advertise / Publicity | |||||||
| Postage / Circulars | |||||||
| Transport | |||||||
| Overheads | |||||||
| Misc. Expenses | |||||||
CHAPTER XXXV
DEPRECIATION CALCULATION
| Item | % rate of Depreciation | Gross Value | Depreciation Amount |
Land & Site Development | |||
Building and Civil Work | |||
Office Building | |||
| Factory and other Bldg. | |||
| Plant & Machinery (3 Shift Basis) | |||
Utilities | |||
Misc. Fixed Assets | |||
Total |
Year | Building | Plant / Machinery | Other Assets | Boiler | Total |
| Depreciation Factor % | 5.00 | 33.33 | 33.33 | 100.00 in first year | |
| Opening Bal | |||||
| Less: Depn | |||||
| Opening Bal | |||||
| Less: Depn | |||||
| Opening Bal | |||||
| Less: Depn | |||||
| Opening Bal | |||||
| Less: Depn | |||||
| Opening Bal | |||||
| Less: Depn | |||||
| Opening Bal | |||||
| Less: Depn | |||||
| Opening Bal | |||||
| Less: Depn | |||||
| Balance |
CHAPTER XXXVI
INTEREST CALCULATION AND REPAYMENT SCHEDULE
| Year | No. of Installment | Amount of Installment | Balance | Interest on Balance | Annual Total of Interest |
| I | |||||
| II | |||||
| III | |||||
| IV | |||||
| V | |||||
| VI | |||||
| VII |
| Year | I | II | III | IV | V | VI | VII |
| W. C. Loan | |||||||
| Annual Interest 16.50 % | |||||||
| Interest on Term Loan | |||||||
| Total |
![]() |
![]() |
![]() |